This project encompasses the development of a new Wastewater Treatment Facility, Pump House, Host Campsite, supporting utility infrastructure, and the expansion of the existing Maintenance Building. The scope of work includes, but is not limited to, site preparation, erosion control, excavation, and building construction utilizing aggregates, cast-in-place concrete, and asphalt paving. Additional components include the installation of on-site drain fields, water and sanitary sewer lines, fencing and slide gates, catch basins, subsurface drainage systems, topsoil placement, restoration planting, and various other site improvements.